Project Detail

Tracked Machine Broken Down for Container Loading

Track undercarriage, main frame, and internal conveyor section separated, protected, and staged in sequence for a full container export load.

Equipment type

Tracked material-handling machine

Transport method

Standard Container

Project scope

Dismantling & Crating

Project location

Houston, TX

Project Overview

This project involved disassembling a large tracked machine to its major sections for container export. Work included separating the track undercarriage from the main frame, removing and protecting the internal conveyor/elevator assembly, building custom crates for the smaller components, and staging every section in the sequence it would need to load — so the container could be packed without rework once the carrier arrived.

Project Snapshot

Removed components
Track undercarriage, main frame/box assembly, conveyor/elevator section
Handling objective
Reduce the machine to sections that fit a standard container
Next stage
Final securement and documentation before container seal
Output
Transport-ready component set, fully crated and loaded

What Was Done

  • Reviewed the machine's construction and identified where it could be safely broken down into major sections for container loading.
  • Separated the track undercarriage from the main frame using the appropriate lifting and rigging setup.
  • Removed the internal conveyor/elevator assembly and staged it as its own protected section.
  • Built custom wood crates for the smaller components and labeled each one for handling and re-assembly.
  • Sequenced and loaded every section into the container, from the undercarriage forward to the smaller crated parts.

Project Workflow

Step 01

Initial review

Machine construction, dimensions, and container handling requirements reviewed.

Step 02

Controlled breakdown

Track undercarriage, main frame, and conveyor/elevator sections separated per the handling plan.

Step 03

Protection & crating

Components protected, smaller parts crated, everything labeled and staged.

Step 04

Container loading

Sections sequenced and loaded into the container for export.

Recent Projects

Real Equipment Preparation Work

See what actually happens – from cleaning to loading.

All Projects

Need similar dismantling work for your equipment?

Request a Quote →