Equipment Dismantling & Disassembly

Heavy Equipment Dismantling for Transport & Export

Atlantic Heavy Loaders dismantles construction, agricultural, and industrial equipment to reduce dimensions, protect components, and prepare machinery for its next transport stage. Every heavy equipment dismantling project is scoped to a specific packing, loading, and shipping method – not performed as a generic teardown, so nothing is removed that the move doesn't require.

Licensed & Insured
USDA Compliant
ISPM-15 Certified
Nationwide Dispatch

Transport-ready sizing

Every teardown is sized to the carrier, container, or trailer limits of the next move.

Components protected

Removed parts are labeled, wrapped, and secured so nothing is damaged or lost in transit.

Dismantling happens at our Houston hub or your site

equipment doesn't move until it's ready.

One request, one team

No subcontractor handoffs between teardown, packing, and loading.

Why It Matters

Prepare Oversized Equipment Without Unnecessary Disassembly

Every heavy equipment dismantling project starts with the actual transport requirement, not a standard checklist. Some machines only need a boom or attachment separated to clear height and width limits; others require a full teardown to fit inside a container. Atlantic Heavy Loaders scopes each construction equipment dismantling project against the real dimensions of the trailer, container, or flat rack it's headed for, so the work is never cut short – and never more extensive than the move demands.

  • Dimensions are confirmed against the transport method before any work begins
  • Only the components required by size or logistics are removed
  • Fasteners and small parts are labeled for reassembly at destination
Our Commitment

A Controlled Disassembly Plan Built Around the Next Transport Stage

  • Dimensions confirmed before teardown starts
  • Scope limited to what the move requires
  • Parts labeled for reassembly
Request a Quote →
Process

How the Work Is Performed

  1. Project Review

    Equipment specs and the target transport method are confirmed before scheduling.

  2. Disassembly Plan

    A teardown scope is built around the confirmed dimensions and handling requirements.

  3. Controlled Removal

    Components are removed in sequence to protect structural and mechanical integrity.

  4. Protection and Labeling

    Removed parts are wrapped, tagged, and organized for reassembly.

  5. Next-Stage Preparation

    Disassembled equipment is staged for crating, storage, or loading.

Options

One Disassembly Plan, Multiple Transport Options

Option 01

Standard Container Loading

Disassembly scoped to fit within standard or high-cube container dimensions.

Option 02

Open Top or Flat Rack

Partial teardown for equipment that exceeds container height or width limits.

Option 03

Domestic Heavy Haul

Disassembly to meet state and DOT permit limits for oversized road transport.

Option 04

Export Crating

Components staged and sized for export-grade crating after teardown.

Pricing

What Affects Your Dismantling and Export Preparation Cost

Four factors drive the scope — and the price — of a teardown.

01

Equipment Weight & Dimensions

Larger and heavier machines require more extensive rigging, additional labor, and specialized handling equipment, all of which affect the overall cost of the project.

Equipment size determines the scope of work: a skid steer needs one part removed, an excavator three or more
Larger Equipment
More Disassembly
Heavier Lift
02

Service Scope & Complexity

A partial teardown for road transport costs less than a full disassembly for container loading. The number of components removed and the complexity of hydraulic and electrical disconnection both factor into pricing.

Lowest dismantling

Breakbulk

  • Minimal removal
  • More complete machine
ComplexityLow
Moderate dismantling

Flat Rack

  • Selected components removed
  • Positioning & securement driven
ComplexityMedium
Highest dismantling

Standard Container

  • Deeper disassembly
  • Tighter fit constraints
ComplexityHigh
03

Packing Materials & Method

Removed components are protected differently depending on their value and sensitivity. Hydraulic cylinders, control panels, and wiring harnesses are typically individually crated or wrapped, while hardware and small parts are bagged and labeled. The amount of documentation needed for reassembly on arrival — photos, numbering, and component manifests — also factors into this step.

Step 01

Protect

Crate or wrap sensitive components.

Step 02

Label

Bag and identify hardware and small parts.

Step 03

Document

Add photos, numbering, and component manifests.

04

Turnaround Timeline

Standard scheduling lets the teardown run alongside other work in the yard. A timeline tied to a vessel booking or a buyer's delivery date requires dedicated crew time and priority scheduling, which affects cost.

Scheduling intensityStandard → Urgent
Yard schedulePriority slotVessel booking
StandardPriorityUrgent

Not sure which scope your machine needs?

Send the make, model, and target transport method — we'll confirm what has to come off and what it costs.

Request a Quote →
Get Started

Information Needed to Plan the Work

Share these details and we'll come back with a plan, method, and pricing.

  • Equipment make and model

  • Dimensions and weight

  • Site location and access

  • Target transport method and date

Tell us about the project

A short first step — photos and technical files can be requested after submission.

  1. 1. Service
  2. 2. Cargo
  3. 3. Contact
Group of services

Fill in the fields marked * to continue.

Operations

Houston Operations Hub

Equipment is received and staged at our Houston operations hub before dismantling begins – whether it's arriving from a seller, auction, dealer, or carrier. Once dismantling is complete, the project moves directly into its next step – storage, export packing, container or flat-rack loading, or carrier pickup – without re-engaging separate contractors.

Talk to Our Team →

Equipment Receiving

Inbound delivery is logged and inspected on arrival from sellers, auctions, dealers, or carriers.

Controlled Work Area

Equipment and removed components stay staged on-site for the full duration of the project.

Integrated Preparation

Projects move directly into crating, storage, rigging, or loading without a change in contractor – no handoffs.

Nationwide Support

Atlantic Heavy Loaders coordinates on-site dismantling projects beyond Houston as well.

Recent Projects

Real Equipment Preparation Work

See what actually happens – from cleaning to loading.

All Projects
Track undercarriage and main box staged together after the machine was reduced to its major sections
DismantlingContainer

Tracked Machine Broken Down for Container Loading

Track undercarriage, main frame, and internal conveyor section separated, protected, and staged in sequence for a full container export load.

Heavy EquipmentView Project →
Harvester rigged on chains and swung into position over the flat-rack container
CombineFlat Rack

CLAAS Lexion 740 Loaded onto Flat-Rack Container

A tracked CLAAS Lexion 740 combine rigged, lifted by reach stacker, and set onto a 40-foot flat-rack container for export.

Agricultural EquipmentView Project →
CleaningPhytosanitary

John Deere Wheel Loader Washed for Export Prep

Full hot-water pressure wash of a John Deere wheel loader with a Martin quick-attach front end — tires, undercarriage, and linkage cleared of soil ahead of inspection.

Wheel LoadersView Project →
Reach stacker lifting the John Deere S770 combine over the flat-rack container before lowering
CombineFlat Rack

John Deere S770 Combine Loaded onto Flat-Rack Container

A wheeled John Deere S770 combine rigged on chains, lifted clear of its trailer by reach stacker, and set onto a 40-foot flat-rack container for export.

Agricultural EquipmentView Project →
Crate staged on a spread-axle flatbed, ready for the road
CratingHeavy Haul

Turbine Compressor Package Crated for Heavy-Haul Export

A multi-crate turbine-driven compressor package built into oversized export crates, stenciled for handling, and staged on spread-axle flatbeds for the next leg of transport.

Industrial EquipmentView Project →
Crated track assemblies staged on the flatbed, ready for pickup
CratingFlatbed

CAT D6 Track Assemblies Crated for Flatbed Transport

A full set of dozer track assemblies individually crated, labeled, and palletized, then staged on a flatbed trailer for pickup.

Machinery Parts & ComponentsView Project →
FAQ

Frequently Asked Questions

Yes. Atlantic Heavy Loaders performs heavy equipment dismantling both at our Houston operations hub and on-site at the customer's location, depending on the project and access requirements.

Need International Transportation After Preparation?

Once your equipment is dismantled and export-ready, Atlantic Project Cargo (APC) organizes the international transportation to get it where it needs to go.

Request an Export Quote →