
Cab and Canopy Removal
Operator cabs and canopies are detached to bring overall height within transport limits.
Atlantic Heavy Loaders dismantles construction, agricultural, and industrial equipment to reduce dimensions, protect components, and prepare machinery for its next transport stage. Every heavy equipment dismantling project is scoped to a specific packing, loading, and shipping method – not performed as a generic teardown, so nothing is removed that the move doesn't require.
Every teardown is sized to the carrier, container, or trailer limits of the next move.
Removed parts are labeled, wrapped, and secured so nothing is damaged or lost in transit.
equipment doesn't move until it's ready.
No subcontractor handoffs between teardown, packing, and loading.
Every heavy equipment dismantling project starts with the actual transport requirement, not a standard checklist. Some machines only need a boom or attachment separated to clear height and width limits; others require a full teardown to fit inside a container. Atlantic Heavy Loaders scopes each construction equipment dismantling project against the real dimensions of the trailer, container, or flat rack it's headed for, so the work is never cut short – and never more extensive than the move demands.
Industrial dismantling services scoped to the equipment's configuration and the handling requirements of the next transport stage.

Operator cabs and canopies are detached to bring overall height within transport limits.

Booms, sticks, and attachments are disconnected and staged separately to reduce length and width.

Counterweights and guarding are removed to bring machine weight and profile within carrier limits.

Undercarriages and axles are isolated where required for container or flat-rack loading.

Every removed part is tagged and organized to support reassembly at destination.

Disassembled sections are staged and secured to match the exact loading plan.
Equipment specs and the target transport method are confirmed before scheduling.
A teardown scope is built around the confirmed dimensions and handling requirements.
Components are removed in sequence to protect structural and mechanical integrity.
Removed parts are wrapped, tagged, and organized for reassembly.
Disassembled equipment is staged for crating, storage, or loading.
Disassembly scoped to fit within standard or high-cube container dimensions.
Partial teardown for equipment that exceeds container height or width limits.
Disassembly to meet state and DOT permit limits for oversized road transport.
Components staged and sized for export-grade crating after teardown.
Four factors drive the scope — and the price — of a teardown.
Larger and heavier machines require more extensive rigging, additional labor, and specialized handling equipment, all of which affect the overall cost of the project.

A partial teardown for road transport costs less than a full disassembly for container loading. The number of components removed and the complexity of hydraulic and electrical disconnection both factor into pricing.
Removed components are protected differently depending on their value and sensitivity. Hydraulic cylinders, control panels, and wiring harnesses are typically individually crated or wrapped, while hardware and small parts are bagged and labeled. The amount of documentation needed for reassembly on arrival — photos, numbering, and component manifests — also factors into this step.
Crate or wrap sensitive components.
Bag and identify hardware and small parts.
Add photos, numbering, and component manifests.
Standard scheduling lets the teardown run alongside other work in the yard. A timeline tied to a vessel booking or a buyer's delivery date requires dedicated crew time and priority scheduling, which affects cost.
Send the make, model, and target transport method — we'll confirm what has to come off and what it costs.
Share these details and we'll come back with a plan, method, and pricing.
A short first step — photos and technical files can be requested after submission.
Equipment is received and staged at our Houston operations hub before dismantling begins – whether it's arriving from a seller, auction, dealer, or carrier. Once dismantling is complete, the project moves directly into its next step – storage, export packing, container or flat-rack loading, or carrier pickup – without re-engaging separate contractors.
Inbound delivery is logged and inspected on arrival from sellers, auctions, dealers, or carriers.
Equipment and removed components stay staged on-site for the full duration of the project.
Projects move directly into crating, storage, rigging, or loading without a change in contractor – no handoffs.
Atlantic Heavy Loaders coordinates on-site dismantling projects beyond Houston as well.
See what actually happens – from cleaning to loading.
Yes. Atlantic Heavy Loaders performs heavy equipment dismantling both at our Houston operations hub and on-site at the customer's location, depending on the project and access requirements.
Once your equipment is dismantled and export-ready, Atlantic Project Cargo (APC) organizes the international transportation to get it where it needs to go.